Laserfiche WebLink
F <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> INTRODUCTION. <br /> In accordance with the California Enviionfm' ental Quality Act.(CEQA), San Joaquin County(County)and <br /> Geiry'N. Kaimlos, LLC:(GNK.LLC),prepared an environmental impact report.(EIR) that identifies <br /> adverse imi a'tts related to the,College Park at Mountain House Specific Plan IIIProject. The EIR also <br /> identifies mitigation measures that would reduce or eliminate these impacts. <br /> Section 2108.1.$of the California Public Resources Code §15091(d) and 15097 of the State CEQA <br /> Guidelines require public agencies"to adopt a reporting and monitoring program for changes to the <br /> project which it has adopted or made.a condition of project approval in order to mitigate or avoid <br /> significant effects on the environment."A Mitigation Monitoring and Reporting Program(MMRP) is <br /> required for the College Park at Mountain House Specific Plan III Project because the EIR for the project <br /> identified potentially significant adverse impacts related to construction and implementation activities, <br /> and mitigation measures have been identified to mitigate those impacts. <br /> Adoption of the MMRP will occur along with approval of the proposed project. <br /> PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM <br /> This MMRP has been prepared to ensure that all required mitigation measures are implemented and <br /> completed according to schedule and maintained in a satisfactory manner during the construction of the <br /> project, as required.The MMRP may be modified by San Joaquin County during project implementation, <br /> as necessary,in response to changing conditions or other refinements.A table has been prepared to assist <br /> the responsible parties in implementing the MMRP.The table identifies individual mitigation measures, <br /> j monitoring/mitigation timing,responsible person/agency for implementing the measure,monitoring and <br /> 1 reporting procedure, and space to confirm implementation of the mitigation measures. The numbering of <br /> mitigation measures follows the numbering sequence found in the EIR. <br /> ROLES AND RESPONSIBILITIES <br /> Unless otherwise specified herein, San Joaquin County is responsible for taking all actions necessary to <br /> implement the mitigation measures according to the specifications provided for each measure and for <br /> demonstrating that the action has been successfully completed. San Joaquin County, at its discretion,may <br /> delegate implementation responsibility or portions thereof to the developer(GNK, LLC), a licensed <br /> contractor or other designated agent. <br /> San Joaquin County will be responsible for overall administration of the MMRP and for verifying that <br /> County staff members; and/or the construction contractor has completed the necessary actions for each <br /> measure. San Joaquin County will designate a project manager to oversee the MMRP during the <br /> construction period. Duties of the project manager include the following: <br /> < Ensure that routine inspections of the construction site are conducted by appropriate San Joaquin <br /> County staff; check plans,reports, and other documents required by the MMRP; and conduct report <br /> activities. <br /> < Serve as a liaison between San Joaquin County, the Mountain House Community Services District <br /> (MHCSD), and the construction contractor regarding mitigation monitoring issues. <br /> < Complete forms and maintain reports and other records and documents generated by the MMRP. <br /> College Park at Mountain House Specific Plan III EDAW <br /> San Joaquin County 1 Mitigation Monitoring and Reporting Program <br />