Laserfiche WebLink
F 3 <br /> ENVIRONMENTAL DETERMINATION <br /> The Environmental Checklist,consistent with CEQA Guidelines,was used to determine <br /> whether the proposed project is"within the scope"of the SPIIIEIR and to examine the <br /> continued adequacy of the SPIIIEIR. The Checklist and Discussion assess whether (1) there <br /> are any additional significant environmental effects not previously examined in the SPIIIEIR; <br /> 1 <br /> and, (2)any new mitigation measures are required(CEQA Guidelines.Sections 15168(c), <br /> 2046). <br /> Any one of the following environmental factors would be checked if the proposed project <br /> created a"New Additional Significant Impact Not Addressed in the SPIIIEIR" as indicated <br /> by the Environmental Checklist in Chapter 4. As shown,no such impacts were identified in <br /> the Checklist. <br />�I <br /> [] Aesthetics ❑ Agriculture Resources ❑ Air Quality <br /> ❑ Biological Resources ❑ Cultural Resources ❑ Geology I Soils <br /> ❑ Hazards&Hazardous Materials ❑ Hydrology/Water Quality ❑ Land Use/Planning <br /> 14 Mineral Resources <br /> ❑ ❑ Noise © Population/Housing <br /> ❑ Public Services ❑ Recreation ❑ Transportation/`I'riffic <br /> i <br /> ❑ Utilities/Service Systems ❑ Mandatory Findings of Significance <br /> DETERMINATION: (To be completed by the Lead Agency) <br /> On the basis of this initial evaluation: <br /> Lj I find that the proposed project COULD NOT have a significant effect on the environment,and <br /> a NEGATIVE DECLARATION will be prepared. <br /> r] I find that although the proposed project could have a significant effect on the environment, <br /> there will not be a significant effect in this case because revisions in the project have been made <br /> by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will <br /> be prepared. <br /> I find that the proposed project MAY have a significant effect on the environment, and an <br /> ENVIRONMENTAL IMPACT REPORT is required. <br /> 1 <br /> t <br /> MOLWrAIN HOUSE PROPOSED ALTAMONT HEI(3Krs TENTATIVE MAP 3-1 <br />