My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
feet from white-tailed kite nesting areas shall be established.and maintained during.the <br /> nesting seasori.for the period encompassing nest building and continuing until,fledglings <br /> leave nests'.This setback'applies whenever•construction or other ground disturbing activities <br /> must begin during the nesting season in the presence of nests that are,khown':to be <br /> occupied: Setbacks shall be marked by Brightly colored temporary fencing{a <br /> r <br /> Northern'Harrier If protect construction.begins during the nesting season (Febrda 15- <br /> Augusf31), pre=construction surveys steal[ t;e conducted during the r�est4ng season <br /> s suitable nesting-habitat within 500 feet of�areas of protect activity. The`surVey shk l#gbe_ <br /> m conducted within the 2 weeks before construction begins:, A setback of.'500 feet froYn - .` <br /> norther`n`harrier nesting areas shall be established and maintaineddunnkg the°nesting.season <br /> for the peh6d;encompassing nest building and continurng until fledglings leave_nests This <br /> F setback'applies whenever.construction or other ground disturbing activities must begin during <br /> the nesting season in'the'presence of nests t} at are known to.be'occupied Setbacks shall <br /> be marked by brightly colored temparary fencing. <br /> Common Raptors. If project construction begins during the nesting season'(February 15- <br /> August 31), pro-construction surveys shall be conducted during the.nesting.season.in <br /> suitable nesting habitat within 500 feet of areas of project_activity. The survey,shail be <br /> conducted within the.2 weeks before construction or tree removal begins. If any active nests <br /> are.found, a setback of 200 feet from each nest shall be established and.maintained during <br /> the nesting season for the period encompassing nest building and continuing until fledglings <br /> leave nests. This setback applies whenever construction or other ground disturbing activities <br /> must begin during the nesting season in the presence of nests that are known,-to be. .. <br /> occupied. Setbacks shall be marked by brightly colored temporary fencing. (MM 4.10-6) <br /> Timing: The applicant shall submit a biologist's report of pre-construction surveys to the San <br /> ° Joaquin County Community Development Department(CDD)prior to the issuance of grading <br /> permits for the project. <br /> 33. Conversion of Other Special Status Nesting Bird Habitat: During the SJMSCP application <br /> process, SJCOG will determine whether that specific project site supports suitable habitat for <br /> loggerhead shrike, California horned lark, or tricolored blackbird. If SJCOG determines <br /> suitable habitat is present on or adjacent to a given project site, the following SJMSCP <br /> incidental take avoidance and minimization measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> Loggerhead Shrike. If project construction begins during the nesting season (April 1-August <br /> 31), pre-construction surveys shall be conducted during the nesting season in suitable <br /> nesting habitat within 100 feet of areas of project activity. The survey shall be conducted <br /> j within the 2 weeks before construction or tree removal begins. A setback of 100 feet from <br /> loggerhead shrike nesting areas shall be established and maintained during the nesting <br /> season for the period encompassing nest building and continuing until fledglings leave nests. <br /> I This setback applies whenever construction or other ground-disturbing activities must begin <br /> during the nesting season in the presence of nests that are known to be occupied. Setbacks <br /> shall be marked by brightly colored temporary fencing. <br /> i <br /> California Horned Lark and Tricolored Blackbird. If project construction begins during the <br /> nesting season (April 1-August 31), pre-construction surveys shall be conducted during the <br /> nesting season in suitable nesting habitat within 500 feet of areas of project activity. A <br /> setback of 500 feet from California horned lark and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting season for the period encompassing nest <br /> building.and continuing until fledglings leave nests. This setback applies whenever <br /> construction or other ground-disturbing activities must begin during the nesting season in the <br /> presence of nests that are known to be occupied. Setbacks shall be marked by brightly <br /> r colored temporary fencing. (MM 4.10-7) <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.