Laserfiche WebLink
� m <br /> College Park at Mountain House Specific Plan H1 <br /> ° Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> p <br /> o Mitigation Measure Timing/Schedule Date <br /> Responsibility Action Completed <br /> CL 4.2-4 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD,in <br /> with Existing Agricultural Zoning or Williamson of interim-land conjunction with the <br /> Act Contracts disposal developer <br /> The project applicants shall implement the following <br /> cn mitigation measure: <br /> o < At such time as the interim land disposal of <br /> treated wastewater at the Potnbo property is <br /> v discontinued, GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture--Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with.the <br /> < Before development,the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> water from the canals by the installation of <br /> o pipelines and other means.The filling.of the <br /> irrigation canals shall be approved by BBM. <br /> --o 4.6 CULTURAL RESOURCES <br /> m <br /> 5�- 4.6-2 Cultural Resources--Potential During construction SJCCDD,in <br /> 9' Destruction/Damage to Undiscovered Cultural conjunction with the <br /> 3: Resources developer,and in <br /> a If discovery of unknown cultural materials is made conjunction with <br /> during construction,ground-disturbing activities at qualified <br /> the construction site where the discovery was made archaeologist,if <br /> shall be hatted.The College Park developers.or needed. <br /> CD construction contractor shall contact the San Joaquin <br /> �, ro County Community Development Department <br /> (SJCCDD)immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> notified and retained by the College Park developer, <br /> — The archaeologist shall determine whether the <br /> — resource represents a"unique archaeological. <br />