Laserfiche WebLink
v o <br /> om College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> s• � <br /> o Implementation Implementation&Verification <br /> c Mitigation{Measure Timing/Schedule <br /> Date <br /> Responsibility Action <br /> Completed <br /> employing one of several methods outlined in <br /> Section 5.2.4.15 of the SJMS.CP.These include <br /> cretention of tall vegetation,regular discing of the <br /> ro site, or use of chemicals or traps to kill ground <br /> rosquirrels; <br /> Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> v activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> • During the notabreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation, as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> oDuring the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> anot be disturbed and shall be provided with a <br /> Q' 250-foot protective buffer until and unless <br /> ' the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' <br /> a representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> _E by the permitting agencies,verifies through <br /> 2t noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles <br /> M from the occupied burrows are foraging <br /> y independently and are capable of <br /> 2 independent survival.After the fledglings <br />