Laserfiche WebLink
a+ 4 <br /> m m College Park at Mountain.House Specific.Plan.III <br /> Mitigation Monitoring and Reporting Programs. <br /> Impiemdntatidn& !erifcation <br /> Mitigation Measure Timing/Schedule Implementation <br /> o Responsibility Action Date <br /> `` Completed <br /> for Protection of the San Joaquin Kit Fox before <br /> a' <br /> 0 or during Ground Disturbance(US Fish and <br /> N Wildlife Service[FWS] 1999b)shall apply <br /> m (except that pre-construction survey protocols <br /> shall remain as established in the above <br /> paragraph).These standards include provisions for <br /> n educating construction workers regarding the kit <br /> afox,keeping heavy equipment operating at safe <br /> speeds, checking constructionpipes for kit fox <br /> occupation during construction,and similar low- <br /> or no-cost activities. <br /> 4.10-10 Biological Resources—Loss or Alteration of Before construction. SJCOG,in <br /> NO Jurisdictional Waters of the United States coordination with <br /> Impacts to waters of the United States are not currently D.FG,USACE and/or <br /> mitigated by participation in the SJMSCP.Therefore, RWQCB <br /> the College Park developers shall implement the <br /> following measures: <br /> K < Before implementation of any Tentative Map or <br /> development project(if no Tentative Map)under <br /> o the College Park project,a formal Section 404 <br /> delineation of waters of the United States, <br /> o including wetlands,shall be conducted by a <br /> o' qualified biologist in the Tentative Map or <br /> development project area if the area includes <br /> a features that are potentially subject to United <br /> a States Army Corp of Engineers(USACE) <br /> @ jurisdiction(ponds,irrigation canals,and <br /> drainages).The delineationshall be submitted to <br /> USACE for verification, <br /> `n < If, based on the verified delineation, it is <br /> m� determined that fill of waters of the United States <br /> would result from the Tentative Map or <br /> development project,authorization for such fill <br />