Laserfiche WebLink
to n <br /> 0 College Park at Mountain House Specific Plan-M" <br /> Mitigation Monitoring and Reporting'Program, <br /> c7 <br /> c <br /> Implemettaton&Verfcationo implementationMitigation Measure Timing/Schedule <br /> °c Responsibility Action Date <br /> a Completed <br /> below: <br /> o Special-Status Plants Before construction SJCOG,in< Before any ground-disturbing or vegetation- consultation with <br /> clearing activities;a qualified botanist shall USFWS and DFG <br /> conduct surveys for the special-status plant <br /> species identif ed in Table 4,11-1 of the FIR. <br /> '77 Surveys shall be conducted at the appropriate <br /> time, when the target species would be in flower <br /> and therefore clearly identifiable(i.e,,blooming <br /> period)and in all areas of suitable habitat that <br /> would potentially be disturbed.If no special- <br /> PIJ status plants are found,no further mitigation <br /> shall be required. <br /> • If special-status plants are found and the <br /> populations can be avoided during project <br /> implementation,they shall be clearly marked <br /> in the field by a qualified botanist for <br /> avoidance during construction activities <br /> If special-status plant populations cannot be <br /> 0avoided, consultations with DFG and/or <br /> 3z USFWS may be required,depending on the <br /> a listing status of the species present,These <br /> 0. consultations shall determine appropriate <br /> mitigation measures for any populations that <br /> would be affected by the implementation of <br /> the proposed project.Appropriate measures <br /> may include the creation of off-site <br /> populations through seed collection or <br /> transplanting,preservation and enhancement <br /> of existing populations, or restoration or <br /> M creation of suitable habitat in sufficient <br /> quantities to compensate for the impact. <br /> California RedrLegged Frog Before construction STCOG,in <br />