Laserfiche WebLink
rn <br /> College Park at Mountain House Specille Platz III <br /> Mitigation Monitoring and Reporting Program <br /> 0 lm lementationA Verification <br /> Implementation p <br /> o Mitigation Measure Timing/Schedule Responsibility Action. Date <br /> Completed <br /> Q4.13-4 Noise--Compatibility of Proposed Land Uses After construction SICCDD,in <br /> exceeding Predicted Noise Levels conjunction with the. <br /> The College Park developers shall implement the developer;in <br /> following measures: consultation with a <br /> < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> the fust residence proposed under the College consultant <br /> cn <br /> ., Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment. The noise barrier may consist of a wall, <br /> berm, or combination thereof.The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> cD below 65 dBA Lw/CNEL and as close to 64 dBA <br /> cc°e Lda CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> v <br /> College Park developers. <br /> 0 <br /> c <br /> a <br /> v <br /> 5. <br /> m <br /> cn °c <br /> m � <br /> a ro <br /> d � <br /> � A <br /> c <br /> /UUWM4 ,terry X11 <br />