Laserfiche WebLink
AWi C <br /> Co <br /> W 0 College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o ' ImplementationImplementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> 4.14-2 Visual Quality---Alteration of a Scenic Vista from During and.after MHCSD <br /> Mountain House Parkway construction <br /> C: The following measures shall be implemented by the <br /> College Park developers: <br /> < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> —__ <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments.on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers. This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is.developed, the <br /> west-facing pond berm shall be densely landscaped <br /> by the College.Park developers. In addition,the berm <br /> shall be constructed by the College Park developers <br /> �= using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> o development of the pond. <br /> o <br /> v <br /> n <br /> co <br /> ro <br /> o rn <br /> ca p <br /> 3 � <br />