Laserfiche WebLink
iz © <br /> a <br /> s College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program ' <br /> Implementation Implementation&Verification <br /> o; Mitigation Measure Timing/Schedule • . ReSponsibilityDate <br /> Action Completed <br /> Q maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> discharges; <br /> o < Specify BMP inspection protocols toensure that <br /> the BMPs are effective and ensure that the <br /> iv <br /> B monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> 00 measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> n < Identify the types of materials used for <br /> o equipment operation; <br /> CD <br /> < Identify measures to prevent or clean up spills of <br /> CD <br /> hazardous materials used for equipment <br /> v operation and hazardous waste; <br /> W < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> subsequent site-development activities; <br /> < identify personnel training requirements and <br /> yprocedures that will be used to ensure that <br /> ro workers are aware of permit requirements and <br /> v0 proper installation and performance inspection. <br /> n methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> o supervisory duties related to implementation of <br /> the SWPPP;and <br /> < Require all construction contractors to retain a <br />