Laserfiche WebLink
K M <br /> cam' 9 <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Veiification <br /> o Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility' Action <br /> Completed <br /> CU <br /> ► Before project activity,USFWS shall be consultation with <br /> CL consulted to determine whether widening of USFWS <br /> Grant Line Road has potential to adversely affect <br /> California red-legged frog.It may be necessary <br /> to conduct a formal habitat assessment and <br /> osurveys to make such a determination.If it is <br /> determined that adverse effects are unlikely to <br /> occur,no further mitigation shall be-required. <br /> < if it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> NO, Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.These may include limiting <br /> CD activities to certain seasons,minimizing <br /> CD vegetation removal and in-water construction <br /> W activities, conducting pro-construction surveys, <br /> R_ and conducting daily.surveys and monitoring of <br /> construction areas.If necessary,appropriate <br /> ccompensation for loss of habitat and other adverse <br /> r effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> o habitat and creation of additional habitat. <br /> Swainson's Hawk Before construction S7COG,in' <br /> o cn < if project construction begins during the (surveys shall be consultation with DFG <br /> Q <D Swainson's Hawk nesting.season,as defined by conducted 2 weeks <br /> DFG(March 1 to September 15),pre-construction prior to construction <br /> o surveys shall be conducted in areas of suitable activities) <br /> nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br /> VM9 tom! 40m, (L® T" 1 I (MO (am (M L1E ( I %M um [ <br />