Laserfiche WebLink
"-,In 1-1i"-1 .-M "--I 1 10-..-.. ! 17=1 11-M. <br /> W p <br /> v`CD College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> n Implementation&Verification. <br /> Mitigation Measure Timing/Schedule implementation <br /> o ResponsibilityAction Date <br /> Completed <br /> qualified biologist and DFG determine it would <br /> not be likely to adversely affect the nest. <br /> y Monitoring of the nest by a qualified biologist <br /> CD may be required if the activity has potential <br /> adversely affect the nest. <br /> CD <br /> San Joaquin Kit Fog Before construction SJCOG, in <br /> < To minimize the potential for destruction of an (surveys to be consultation with <br /> occupied burrow and direct take of a kit fox,a completed no more USFWS and DFG <br /> pre-construction survey for active and potential kit than 30 days and no <br /> fox dens shall be conducted by a qualified less than 14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance. activities) <br /> � or constriction activity.The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas.Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> Standardized Recommendations for Protection of <br /> the San Joaquin Kit Fox Before or During Groun <br /> o Disturbance(USFWS 1999). <br /> < If no active dens are found during the surveys,a <br /> 0 letter report documenting the survey methodology <br /> and findings shall be submitted to USFWS and <br /> DFG within 5 days after survey completion and <br /> before the start of ground disturbance or <br /> c� construction activity,and no further mitigation <br /> shall be necessary. <br /> 0 < Any known or potential dens discovered within <br /> the survey area shall be monitored for 3 days to <br /> determine its current use,If no activity is observe <br /> �n oduring this period,the den shall be destroyed <br /> > immediately to preclude subsequent use.if kit fox <br /> activity is observed,the den shall be monitored fo <br />