Laserfiche WebLink
t <br /> (n 0 <br /> v D <br /> cp <br /> W m College Park at Mountain House Specific Plan III <br /> aC Mitigation Monitoring and Reporting Program <br /> n cv Implementation&Verification <br /> Mitigation Measure Timing/Schedule Implementation <br /> o Responsibility Action Date <br /> Completed <br /> N With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> y standards,the County shall extend the standard of <br /> co LOS D to the segment of Byron Road east.of Grant <br /> Line Road. <br /> CD <br /> Because Byron Road is a major regional arterial <br /> r' serving the area,the County shall extend <br /> implementation of Mountain House Master Plan <br /> (MHMP)EIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality—Generation of Temporary,Short- Before construction SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants constriction developer <br /> The College Park developers shall implement the lates <br /> version of the SJVAPCD construction-emissions <br /> K control measures during construction(see"Regulatory <br /> Setting,"above). <br /> v The latest version of the San Joaquin Valley Air <br /> Pollution Control District(SJVAPCD)control <br /> measures are included in the Guide for Assessing and <br /> 2. Mitigating Air Quality Impacts(SJVAPCD 1998)and <br /> repeated in the"Regulatory.Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> �- the SJVAPCD to implement the current version of the <br /> CD measures at the time individual development <br /> applications are received by the County for <br /> development under College Park. <br /> 4.12-2 Air Quality--Potential Generation of'Toxic Air Before construction. SJVAPCD,in <br /> M Contaminants(TACs) begins and during conjunction with the <br /> ► Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-I.. <br />