Laserfiche WebLink
cn n <br /> Al b <br /> 8 CD College Park at Mountain House Specific Plan M. <br /> Mitigation Monitoring and Reporting Program <br /> �v fmplerirentafion&Uenfication <br /> o Implementation <br /> C; Mitigation Measure Timing/Schedule <br /> Responsibility Action Date <br /> Cornpfeted <br /> �• 4.13. NOISE <br /> c4.13-1 Noise—Generation of Temporary Construction During construction SJ CDD,in <br /> Noise conjunction with the <br /> CD <br /> < Limit project construction activities to the hours developer <br /> between 6:00 a.m.and 9:00 p.m. <br /> 0. <br /> < .Comply with the San Joaquin County <br /> _U Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> recommendations, <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> w installed around stationary equipment,if <br /> necessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD,in <br /> Noise and during conjunction with the. <br /> _. The project applicants shall incorporate the measures construction developer <br /> v <br /> identified below into the project design. <br /> Q Commercial,Office,and Industrial Uses <br /> cD Industrial and commercial Iand uses proposed as part <br /> 78 of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> 13 exceedance of 55 dBA L.4 during daytime hours <br /> B M (7:00 a.m. to 10:00 p.m.)or 50 dBA L,q during <br /> nighttime hours(10:00 p.m.to 7:00 a.m.)at off-site <br /> noise-sensitive receptors, In addition,design and <br />