Laserfiche WebLink
5z O <br /> a <br /> °= College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o lmplementatian-&Verification <br /> Er Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility, Action. <br /> Completed <br /> 4,134 Noise--Compatibility of Proposed Land Uses After construction SJCCDD,in <br /> exceeding Predicted Noise Levels conjunction with the <br /> The College Park developers shall implement the developer;in <br /> following measures: consultation with a <br /> < Traffic,Noise—Arterials.Before occupancy of qualified acoustical <br /> the first residence proposed under the College consultant <br /> `g Park project along each of the seven arterial <br /> segments identified in'fable 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof.The exact location, <br /> rn <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> below 65 dBA L&/CNEL and as close to 60 dBA <br /> m Ld,,/CNEL as feasible.This mitigation shall be <br /> m funded through fair-share payments by the <br /> RL College Park developers. <br /> v <br /> 0 <br /> v <br /> 2 <br /> � N <br /> 4- (n <br /> 0 � <br /> CD <br /> _G C7 <br /> C, <br /> G C] <br /> n � <br /> d <br /> C � <br /> an un <br /> 7 <br /> 'C <br />