Laserfiche WebLink
a) O <br /> CD College Park at Mountain House Specific Plan III <br /> c Mitigation Monitoring and Reporting Program <br /> a Implementation Implementation&Verification. <br /> Mitigation Measure Timing/Schedule <br /> = Responsibility Action ate <br /> Completed <br /> eted <br /> 4.14-2 Visual Quality Alteration of a Scenic Vista from During and after MHCSD <br /> Mountain House Parkway construction <br /> The following measures shall be implemented by the <br /> CD CoIIege Park developers. <br /> < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> _ <br /> Specific PIans I or II at the time the proposed <br /> pond is developed on the Pombo property;the <br /> required landscaping and edge treatments.on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers. This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is.developed,the <br /> west-facing pond berm shall be densely landscaped <br /> K by the College Park developers..In addition,the berm <br /> shall be constructed by the College Park developers <br /> using contoured and rounded slopes to avoid-angular <br /> face slopes.This shall be done concurrent with <br /> o development of the pond. <br /> o <br /> CD <br /> a. <br /> ca <br /> Q <br /> 2 <br /> a <br /> a m <br />