Laserfiche WebLink
� M <br /> r: o <br /> a <br /> College Park at Mountain House Specific fic Plan III <br /> Mitigation Monitoring and Reporting Program <br /> K <br /> a Implementation Implementation&Verification <br /> M. Mitigation Measure Timing/Schedule Responsibility Action Date <br /> v <br /> Completed <br /> n 4.6-3 Cultural Resources----Potential to Uncover Human During construction SJCCDD,in <br /> Remains conjunction with the <br /> (D In accordance with the California Health and Safety developer,and in <br /> Code, if human remains are uncovered during conjunction with <br /> construction at the project site,the College Park qualified archaeologist <br /> 0 <br /> developer or construction contractor shall immediately and County Coroner, <br /> c� halt potentially damaging excavation and notify if needed. <br /> 3 SJCCDD.The County shall,in turn, immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> ¢, 7050.5[b]).If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> on determination(HSC Section 7050[c]). Once a Most <br /> Likely Descendent(MLD)has been designated by the <br /> cn NAHC, the MLD,in consultation with the County, <br /> v shall determine the ultimate disposition of the remains. <br /> The responsibilities of the County for acting upon <br /> notification of a discovery of Native American human <br /> o remains are outlined in detail in the PRC Section <br /> 5097.9.Measures likely resulting from the above <br /> could include preservation in place and <br /> a capping/avoidance,or removal and continued <br /> monitoring of ground-disturbing activities. <br /> � ro <br /> o cn 4.7 DRAINAGE <br /> a <br /> 0. 4.7-2 Drainage--Result in Flooding or Exceed the Before construction MHCSD, in <br /> 0 Capacity of the Storm-drain System conjunction with the <br /> o ° The College Park developers shall expand WQB1 as developer <br /> a� <br /> 3 required to accommodate runoff from the College <br /> — Park project,or shall provide the required on-site <br />