Laserfiche WebLink
K M <br /> :+ 0 <br /> n <br /> o College Park at Mountain House Specific Plan III <br /> = Mitigation Monitoring and Reporting Program <br /> __ Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> Completed <br /> a maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> o during construction that could be present in <br /> ?: stormwater drainage and non-stormwater <br /> _ <br /> discharges; <br /> ca < Specify BMP inspection protocols to ensure that <br /> ai the BMPs are effective and ensure that the <br /> B monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> eo measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> n < Identify the types of materials used for <br /> o equipment operation; <br /> CD <br /> < Identify measures to prevent or clean up spills of <br /> hazardous materials used for equipment <br /> W operation and hazardous waste; <br /> T < Identify emergency procedures for responding to <br /> o spills; <br /> < Identify BMPs that shall be used in all <br /> n� subsequent site-development activities; L <br /> _ < Identify personnel training requirements and <br /> procedures that will be used to ensure that <br /> = cn workers are aware of permit requirements and <br /> m-0 proper installation and performance inspection <br /> n_ methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> csupervisory duties related to implementation of <br /> the SWPPP;and <br /> �` < Require all construction contractors to retain a <br />