Laserfiche WebLink
KM <br /> 0 <br /> co' A <br /> °= College Park at Mountain House Specific Plan III <br /> o' <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> Implementation&Verification <br /> 6 Mitigation Measure Timing/Schedule <br /> Responsibility Action Gomapleted <br /> requirements from the County Environmental <br /> Health Department.Dairy waste ponds or any <br /> other sources of contamination shall be removed <br /> under a qualified hazardous materials expert in <br /> accordance with applicable regulations and <br /> requirements from the Central Valley RWQCB or "�, <br /> 0 <br /> the California Department of Toxic Substances, 1�. <br /> B This includes the December 4,2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts. If the testing <br /> reveals contamination,the regulatory agencies <br /> o shall be contacted,any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> cQ (i.e.,septic systems,refuse piles, waste ponds, <br /> co electrical transformers containing PCBs)on the <br /> v project site and off-site infrastructure sites shall be <br /> a� <br /> identified and removed under the supervision of <br /> qualified hazardous materials experts and in <br /> c accordance with applicable regulations before <br /> construction. The applicant shall demonstrate toj <br /> M the County Environmental Health Department that <br /> o the above has taken place before issuance of <br /> building permits. If the experts observe potential <br /> 0 Cn soil contamination or noxious odors associated <br /> a m with these facilities,the soils underlying these <br /> _. facilities shall be sampled and tested by the <br /> n experts.If the testing reveals contamination,the <br /> jregulatory agencies shall be contacted,any <br /> —_ recommendations made by the experts shall be <br /> implemented,and the County Environmental <br />