Laserfiche WebLink
CO0 <br /> m o <br /> v CD College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 0ai Implementation&Verification: <br /> o Implementation <br /> c Mitigation Measure Timing/Schedule pate. <br /> o Responsibility Action Completed <br /> ,. _. <br /> below: <br /> o Special-Status Plants Before construction SJCOG, in <br /> C <br /> < Before any ground-disturbing or vegetation- — - .... _ consultation with <br /> W clearing activities,a qualified botanist shall USFWS and DFG <br /> rn conduct surveys for the special-status plant ' <br /> species identified in Table 4.11-1 of the EIR, <br /> -o Surveys shall be conducted at the appropriate <br /> time,when the target species would be in flower <br /> and therefore clearly identifiable(i.e.,blooming <br /> period)and in all areas of suitable habitat that <br /> would potentially be disturbed. If no special- <br /> status plants are found,no further mitigation <br /> U1 shall be required. <br /> • If special-status plants are found and the <br /> populations can be avoided during project <br /> implementation,they shall be clearly marked <br /> in the field by a qualified botanist for <br /> avoidance during construction activities <br /> • If special-status plant populations cannot be <br /> avoided,consultations with DFG and/or <br /> USFWS may be required,depending on the <br /> listing status of the species present.These <br /> 6 consultations shall determine appropriate <br /> co mitigation measures for any populations that <br /> would be affected by the implementation of <br /> C- the proposed project.Appropriate measures <br /> CD may include the creation of off-site <br /> -8 populations through seed collection or <br /> transplanting,preservation and enhancement <br /> of existing populations,or restoration or <br /> �n M creation of suitable habitat in sufficient <br /> quantities to compensate for the impact. <br /> California Red-Legged Frog Before construction SJCOG,in <br />