My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cn n <br /> m o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> C) °* Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Date <br /> c Responsibility Action <br /> Completed <br /> biologist within the 2 weeks before construction <br /> 0 or tree removal begins. If no active nests are <br /> CA found,no further mitigation shall be required. <br /> M < If active nests are found,impacts shall be <br /> Cn <br /> avoided by establishment of appropriate buffers. <br /> No project activity shall commence within the <br /> buffer area until a qualified biologist confirms <br /> v that the nest is no longer active. DFG guidelines <br /> recommend implementation of 0.25-or 0.5-mile <br /> buffers,but the size of the buffer may be adjusted <br /> if a qualified biologist and DFG determine it <br /> would not be likely to adversely affect the nest. <br /> Monitoring of the nest by a qualified biologist <br /> may be required if the activity has potential to <br /> adversely affect the nest. <br /> Burrowing Owl Before construction SJCOG,in <br /> < Before project activity,focused surveys for consultation with DFG <br /> burrowing owls shall be conducted by a qualified <br /> biologist in areas of suitable habitat on and <br /> within 250 feet of the project site. Surveys shall <br /> be conducted in accordance with DFG protocols <br /> Q (DFG 1995). <br /> o < If no occupied burrows are found in the survey <br /> ' area,a letter report documenting survey methods <br /> and findings shall be submitted to DFG,and no <br /> Q- further mitigation is necessary. <br /> CD < If an occupied burrow with an active nest is <br /> o found,impacts shall be minimized by <br /> establishing a 250-foot buffer area around the <br /> -0 burrow.No project activity shall occur within the <br /> La o buffer area until a qualified biologist confirms <br /> Ethat the nest is no longer active. The size of the <br /> buffer area may be adjusted if a qualified <br />
The URL can be used to link to this page
Your browser does not support the video tag.