Laserfiche WebLink
(n n <br /> m o <br /> Z3 — <br /> C_ <br /> m College Park at Mountain House Specific Plan III <br /> 0) Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> .� Completed <br /> 4.142 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> Mountain House Parkway construction <br /> a ;.. The following measures shall be implemented by the <br /> CD College Park developers: <br /> < If the landscaping and edge treatments required <br /> CD CDby the MHMP and MHCSD Design Manual have <br /> 0 not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers. In addition,the berm <br /> �- shall be constructed by the College Park developers <br /> using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> K development of the pond. <br /> o• � <br /> =3 <br /> ca <br /> w <br /> CL <br /> CD <br /> o rn <br /> � a <br /> 3 <br />