My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006255
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600365
>
SU0006255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:28:24 PM
Creation date
9/5/2019 10:46:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006255
PE
2638
FACILITY_NAME
PA-0600365
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600365\SU0006255\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTs TENTATIVE MAP 2.0 PROJECT DESCRIPTION <br /> I <br /> s <br /> The County Board of Supervisor's adopted Mountain House Specific Plan 11 in February . <br /> 2005. Shea Homes and Trimark Communities, LLC;propose to subdivide parcels and <br /> develop residential,commercial, and public/recreational uses within Neighborhoods,C, H, 1, <br /> and J of Specific Plan 11. Neighborhoods I and J are north of Byron Road and Neighborhood <br /> H is just south of Byron Road. <br /> The Board of Supervisors adopted Mountain House Specific Plan III in November 2005. <br /> This is the third specific plan approved under the Mountain House Master Plan(MHMP). <br /> 4 The area of Specific Plan IH'includes the southern portion of the community, primarily south <br /> [ of Grant Line Roadand north of,1-205. Specific Plan III contains a mix of residential <br /> densities, commerci-al/office uses,,limited industrial uses, elementary schools, neighborhood <br /> i parks, a high school,and a college component to accommodate a community college_ In <br /> addition, a 31.3-acre community park will be developed in the southwest portion of <br /> Neighborhood A/B. Open space corridors are planned along the major power and gas-line <br /> easements that extend through Mountain House. The Altamont Heights subdivision is a part <br /> of Neighborhood AIB. <br /> PROJECT DESCRIPTION <br /> The project site is included in the Mountain House Master Plan (MHMP) and Specific Plan <br /> III, and was evaluated as a part of the environmental analysis that was conducted in 1994 <br /> (MEIR) and in 2005 (SPIIIEIR). The applicant/property owner, Golden State Investments 11, <br /> LP, is requesting approval of a Major Subdivision and a Development Agreement in <br /> accordance with the Master Plan and Specific Plan III. In addition to these submittals, the <br /> applicant is requesting Amendments to the General Plan, Master Plan, and Specific Plan 111. <br /> The tentative map for the major subdivision includes.the following information and plans: <br /> Street Lighting Plan <br /> Second Unit Plan <br /> Circulation and Transit Plan <br /> Site Landscape, Fencing&Wall Plan <br /> Street Landscape Plan <br /> The Tentative Map, Second Unit Plan, and the Circulation and Transit Plan are included at <br /> the end of this chapter as Figures 2-2 through 2-4. <br /> Tentative Map <br /> The tentative map depicted in Figure 2-2 shows the 12:7-acre site subdivided into 53 parcels <br /> ranging in size from 5,746 square feet to 13,452 square feet. Figure 2-3 identifies the six lots <br /> designated with second units. These lots are located in the northern portion of the project site <br /> around"A" and "B" Courts and range in size from 7,904 square feet to 11,813 square feet. <br /> Figure 2-4 illustrates the Circulation and Transit Plan. The project site will be served through <br /> ' two entry points off of"I"' Street, which is accessed from Central.Parkway. The interior <br /> streets all have sidewalks along both sides of the street. A Class III bike route is provided <br /> 2-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.