Laserfiche WebLink
;z rn <br /> a <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Mitigation Measure Timing/Schedule <br /> Implementation implementation&Verification <br /> Responsibility Action Date <br /> v <br /> Completed <br /> 4,6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD,in <br /> Remains conjunction with the <br /> In accordance with the California Health and Safety developer,and in <br /> Code, if human remains are uncovered during conjunction with <br /> construction at the project site,the College Park qualified archaeologist. <br /> ro developer or construction contractor shall immediately and County Coroner, <br /> 0 <br /> 'n halt potentially darnaging excavation and notify if needed. <br /> SJCCDD.The County shall,in turn,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands (HSC Section <br /> a� 7050.5[b]).If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that. <br /> a determination(HSC Section 7050[c]). Once a'Most <br /> Likely Descendent(MLD)has been designated by the <br /> cn NAHC, the MLD, in consultation with the County, <br /> W <br /> shall determine the ultimate disposition of the remains. <br /> The responsibilities of the County for acting upon <br /> notification of a discovery of Native American human <br /> o remains are outlined in detail in the PRC Section <br /> 5097.9. Measures likely resulting from the above <br /> –�� could include preservation in place and <br /> z capping/avoidance,or removal and continued <br /> 0. monitoring of ground-disturbing activities. <br /> CD <br /> o cr, 4.7 DRAINAGE <br /> n, 4.7-2 Drainage---Result in Flooding or Exceed the Before construction MHCSD,in <br /> Capacity of the Storm-drain System conjunction with the <br /> oThe College Park developers shall expand WQB 1 as developer <br /> m <br /> required to accommodate runoff from the College <br /> Park project,or shall provide the required on-site <br /> © ® EM �� <br />