Laserfiche WebLink
Q <br /> n <br /> College Park at Mountain House Specific Plan III <br /> o' <br /> ' Mitigation Monitoring and Reporting Program <br /> o' Mitigation Measure Timing/Schedule Implementation <br /> Implementation i Verification <br /> Responsibility Action Data <br /> u <br /> Completed <br /> n action required"in the regulatory agency <br /> databases,and the facilities that are the.source of <br /> CD <br /> any contamination have been removed in <br /> accordance with applicable regulations.The <br /> project developers may attempt to advance the <br /> o <br /> above,if they desire,by conducting their own <br /> investigations of these sites in coordination with <br /> 53 <br /> 3 the property owners and regulatory agencies, and <br /> working with the regulatory agencies to <br /> accomplish the above. <br /> < Before demolition,renovation,or modification of <br /> structures on the project site and off-site <br /> ?Q1 infrastructure sites constructed before 1981 <br /> (parcels containing such structures are listed in <br /> Table 4.9-2 of the EIR),the project developers <br /> shall contract with qualified hazardous materials <br /> o experts to survey these buildings for asbestos and <br /> lead-based paint.Demolition,renovation,or <br /> modification of any structures identified as <br /> containing asbestos or lead-based paint shall be <br /> performed by a licensed asbestos and lead-rased <br /> paint abatement contractor in accordance with <br /> applicable regulations. <br /> 4.9-4 Public Health and Safety—Locate a School Site in During design phase SJCCDD,in <br /> an Area of Potential Hazards conjunction with the <br /> c < The College Park developers shall have a developer and a <br /> m preliminary Endangerment Assessment(PEA) qualified hazardous <br /> 0 prepared by a qualified hazardous materials materials expert;in, <br /> consultant for the school located near the.Lucky J consultation with CDE <br /> Dairy,if required by California Department of and DTSC <br /> n Education(CDE).The PEA shall be prepared in <br /> accordance with CDE and Department of Toxic <br /> -� = Substances Control(DTSC)requirements and <br />