Laserfiche WebLink
'M7 aN�J) 'I i `l 'W ) I] ; '] ' "W) ` ') 7) 1—W7 <br /> cn 0 <br /> � o <br /> a)rn College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting.Program <br /> o Implementation <br /> Implementation&,-Verfflcation <br /> Mitigation Measure Timing/Schedule <br /> Responsibility Action Date <br /> Cornpieted <br /> for Protection of the San Joaquin Kit Fox before <br /> 0 or during Ground Disturbance(US Fish and <br /> N Wildlife Service[FWS] 1999b)shall apply <br /> � (except that pre-construction survey protocols <br /> shall remain as established in the above <br /> paragraph).These standards include provisions fo <br /> educating construction workers regarding the kit <br /> fox,keeping heavy equipment operating at safe <br /> _ speeds, checking construction pipes for kit fox <br /> occupation during construction,and similar low- <br /> or no-cost activities. <br /> 4.10-10 Biological Resources—Loss or Alteration of Before constructionSJCOG,in <br /> CA) Jurisdictional Waters of the United States coordination with <br /> Impacts to waters of the United States are not currently DFG,USACE and/or <br /> mitigated by participation in the SJMSCP.Therefore, RWQCB <br /> the College Park developers shall implement the <br /> following measures: <br /> < Before implementation of any Tentative Map or <br /> development project(if no Tentative Map)under <br /> o the College Park project;a formal Section 444 <br /> delineation of waters of the United States, <br /> Z; including wetlands,shall be conducted by a <br /> qualified biologist in the Tentative Map or <br /> development project area if the area includes <br /> features that are potentially subject to United <br /> a. States Army Corp of Engineers(USACE) <br /> CD <br /> jurisdiction(ponds,irrigation canals,and <br /> drainages).The delvnea6on.shalI be submitted to <br /> USACE for verification. <br /> < If,based on the verified delineation, it is <br /> -o <br /> o M determined that fill of waters of the United States <br /> would result from the Tentative Map or <br /> development project,authorization for such fill <br />