Laserfiche WebLink
M <br /> o <br /> °= College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> o Mitigation Measure Timing/Schedule implementation Date: <br /> �. Responsibility Action. Completed <br /> v 4.13-4 Noise—Compatibility of Pro osed Land Uses After construction SJCCDD,in <br /> � P h' P <br /> exceeding Predicted Noise Levels conjunction With the <br /> CD <br /> -8 The College Park developers shall implement the developer,in <br /> 2 following measures; consultation with a <br /> < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> _0 the first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> � segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof,The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> c . below 65 dBA Ld,,/CNEL and as close to 60 dBA <br /> CD L&/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> College Park developers. <br /> m . <br /> 0 <br /> c <br /> iy <br /> 2 <br /> Ch c <br /> ns cn <br /> O m <br /> c_ Cn <br /> c n <br /> _i <br /> n "O <br /> d � <br /> C � <br /> C::3 C::3 C=3 E=:3 © E::3 C::3 C::3 D EM ® C=3 = Q <br />