Laserfiche WebLink
.,.--�➢ r-�.3 �4-.-� '� ,�—.J �1 ...-.�� �-�.1 'r..�J � � La�.l .�..r..J ..rs._7 c� r-�..-1 .t..f..A Vr-�.-1 <br /> 97 p <br /> � a <br /> o College Park at Mountain House-Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o �' Implementation Implementation&Verification <br /> c Mitigation Measure Implementation <br /> Responsibility Action Date <br /> Completed <br /> 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> z Mountain House Parkway construction <br /> cThe following measures shall be implemented by the <br /> CD College Park developers: <br /> < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments.on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers. This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is.developed,the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers. In addition,the berm <br /> shaiI be constructed by the College Park developers <br /> ousing contoured and rounded slopes to avoid angular <br /> :3 face slopes.This shall be done concurrent with <br /> o development of the pond. <br /> o• <br /> UZI <br /> CL <br /> 78 a� <br /> C <br /> ra <br /> ro <br /> o rn <br /> Up p <br />