Laserfiche WebLink
MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4. ENviRONMENTAL CHECKLIST <br /> 4.3 AIR QUALITY <br /> refuse piles are removed. The Altamont Heights project site is over one mile west of the <br /> F1abandoned dairies at Mountain House Parkway and Grant Line Road. <br /> Development of the proposed project would involve demolition or renovation of existing <br /> ri buildings that may contain asbestos. Therefore, the proposed project could contribute to the <br /> conditions that make Impact 4.12-2 significant and unavoidable. <br /> FIL Development of the proposed project would result in increases in long-term regional <br /> emissions, primarily associated with automobile traffic. Therefore, the proposed project <br /> Pwould contribute to the conditions that make Impact 4.1.2-5 significant and unavoidable. <br /> t t DISCUSSION REGARDING PROPOSED PROJECT <br /> a) Conflict with or obstruct implementation of the applicable air quality plan? <br /> and <br /> b) Violate any air quality standard or contribute substantially to an existing or projected <br /> air quality violation? <br /> and <br /> c) Result in a cumulatively considerable net increase of any criteria pollutant for which <br /> the project region is non-attainment under an applicable federal or state ambient air <br /> quality standard(including releasing emissions which exceed quantitative thresholds <br /> for ozone precursors)? <br /> Development of Specific Plan III,of which the proposed project is a part,would generate <br /> construction,motor vehicle, and other air emissions (from fireplaces,barbecues, etc). The <br /> MEIR calculated the potential air quality impacts associated with these emissions as part of <br /> the greater MHMP development and concluded that a significant unavoidable impact would <br /> occur(i.e.,conflict with or obstruct implementation of the S3VAPCD Air Quality Attainment <br /> Plan) even with implementation of the mitigation measures identified in the MSIR. <br /> -F, Development of Specific Plan III could potentially conflict with the Air Quality Attainment <br /> Plan,violate air quality standards,contribute substantially to an air quality violation, and/or <br /> result in a cumulatively considerable net increase of criteria pollutants for which the region is <br /> in non-attainment(EDAW, 2005b). <br /> Computer model results resented in the SPIREIR revealed that development of Specific <br /> p p <br /> Plan III would result in long-term regional emission of approximately 58 tons per year of <br /> reactive organic gas(a precursor to the formation of ozone), 38 tons per year of the oxides of <br /> nitrogen (principally nitrogen dioxide),and 112 tons per year of PMIo. SJVAPCD's <br /> recommended significance threshold for each of these emissions is 10 tons per year. <br /> t <br /> Therefore, development of Specific Plan III may contribute to concentrations that exceed <br /> applicable standards because of current non-attainment conditions (EDAW, 2005b). The <br /> resulting impacts would be significant and unavoidable. <br /> 4-14 <br />