Laserfiche WebLink
i <br /> 4 <br /> ENVIRONMENTAL CHECKLIST <br /> t This chapter of the Checklist includes a discussion of existing environmental conditions at <br /> the site, potential environmental impacts resulting from implementation of the proposed <br /> project, and applicable mitigation treasures, if any. The Environmental Checklist covers <br /> 1 specific issues by topic (i.e., Aesthetics, Geology, Land Use, etc.). Each topic includes the <br /> bureaucracy following four sections: (1) Setting; (2) Significant Impacts Identified in the <br /> 2005 SPIIIEIR; (3) Mitigation Measures of the 2005 SPIIIEIR Relevant to the Project; and <br /> (4)Discussion Regarding the Proposed Project. The Checklist questions are shown with a <br /> solid box denoting the potential level of impact. Under the Discussion, if new impacts are <br /> identified, they are followed by mitigation measures that are labeled and numbered. <br /> Mitigation measures that were adopted by the Mountain House Master Plan Final EIR <br /> (MEIR) and College Park at Mountain House Specific Plan III Final EIR (SPIIIEIR) are <br /> identified along with any additional required mitigations based on the current analysis in this <br /> Checklist. The criteria for significance are also identified, when applicable. <br /> Since this Checklist relies on the SPIIIEIR, the standard Checklist has been modified to <br /> address the consistency between the environmental evaluation prepared for Specific Plan III <br /> and the environmental evaluation for the proposed project. The six Checklist categories <br /> include: (1) Less Than Significant or No Impact,(2) Potentially Significant Impact <br /> Adequately Addressed in SPIIIEIR; (3)SPIIIEIR Requires Additional Review: No <br /> Significant Impact; (4)Less Than Significant Impact Due to Mitigation Measures in Project <br /> Description; (5)New Additional Impact Not Addressed in SPIIIEIR; and (6)New Additional <br /> Mitigation Measures Required. <br /> The "Discussion" follows the checked boxes so that the reader is informed as to why a <br /> specific box of the Checklist was marked. The discussions identify earlier analyses, the <br /> source of the information for the conclusion reached, and mitigation measures either already <br />+ required for the project or suggested as part of the current analysis to reduce impacts to a <br /> less-than-significant level. <br /> The proposed project has been analyzed under each component of the Checklist. It has been <br /> determined that the proposed project presents no substantial changes with respect to the <br /> circumstances under which the SPIIIEIR was certified. There are no impacts associated with <br /> the proposed project that were not previously assessed in the SPIIIEIR. There is no new <br /> available information, which was not known at the time the SPIIIEIR was certified, that <br /> requires major revisions of the document. Thus, no additional environmental documentation <br /> is required. <br /> 4 <br /> £_ MOUNTAIN HOUSE PROPOSED At"TAmoNT HEIGHTS TENTATIVE MAP 4-1 <br />