Laserfiche WebLink
K0 <br /> CS, College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> a Implementation <br /> g' Mitigation Measure Timing/Schedule Date <br /> Responsibility Action Completed <br /> n <br /> 4.2-4 Land Use and Agriculture Conflict Substantially After discontinuance SJCCDD,in <br /> ;o with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> `D Act Contracts disposal developer <br /> The project applicants shall implement the following <br /> cc mitigation measure: <br /> < At such time as the interim land disposal of <br /> heated wastewater at the Pombo property is <br /> discontinued,GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with the <br /> a < Before development, the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> n water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> to irrigation canals shall be approved by BBID. <br /> CD <br /> m <br /> 4.6 CULTURAL RESOURCES <br /> RL 4.6-2 Cultural Resources—Potential During construction SJCCDD,in <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> o Resources developer,and in <br /> If discovery of unknown cultural materials is made conjunction with <br /> during construction, ground-disturbing activities at qualified <br /> x the construction site where the discovery was made archaeologist,if <br /> nN y shall be halted.The College Park developers or needed. <br /> � � <br /> construction contractor shall contact the San Joaquin <br /> County Community Development Department <br /> (SJCCDD)immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> Unotified and retained by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br /> I I I I I I I I I I I I I I I I I I I <br />