Laserfiche WebLink
K rn <br /> 0 <br /> v College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> Implementation &Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> n <br /> requirements from the County Environmental <br /> X Health Department.Dairy waste ponds or any <br /> CD other sources of contamination shall be removed <br /> under a qualified hazardous materials expert in <br /> accordance with applicable regulations and <br /> -0 requirements from the Central Valley RWQCB or <br /> the California Department of Toxic Substances. <br /> E3 This includes the December 4,2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts. If the testing <br /> reveals contamination, the regulatory agencies <br /> shall be contacted,any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> (i.e.,septic systems, refuse piles, waste ponds, <br /> CD electrical transformers containing PCBs)on the <br /> project site and off-site infrastructure sites shall be <br /> RL identified and removed under the supervision of <br /> ° qualified hazardous materials experts and in <br /> o accordance with applicable regulations before <br /> construction. The applicant shall demonstrate to <br /> the County Environmental Health Department that <br /> x the above has taken place before issuance of <br /> w building permits.If the experts observe potential <br /> �n soil contamination or noxious odors associated <br /> ti with these facilities, the soils underlying these <br /> d Y 8 <br /> c. facilities shall be sampled and tested by the <br /> experts. If the testing reveals contamination,the <br /> 0 regulatory agencies shall be contacted,any <br /> _ recommendations made by the experts shall be <br /> ,7 = <br /> implemented,and the County Environmental <br /> I I I I I I I I I I I I I I I I I I I <br />