Laserfiche WebLink
Km <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> 6 Mitigation Measure Timing/Schedule Implementation Date <br /> �. Responsibility Action Completed <br /> naction required"in the regulatory agency <br /> databases,and the facilities that are the source of <br /> any contamination have been removed in <br /> �z accordance with applicable regulations. The <br /> n project developers may attempt to advance the <br /> above, if they desire,by conducting their own <br /> investigations of these sites in coordination with <br /> 3 the property owners and regulatory agencies, and <br /> working with the regulatory agencies to <br /> accomplish the above. <br /> < Before demolition,renovation, or modification of - <br /> structures on the project site and off-site <br /> infrastructure sites constructed before 1981 <br /> ti (parcels containing such structures are listed in <br /> Table 4.9-2 of the EIR),the project developers <br /> shall contract with qualified hazardous materials <br /> o experts to survey these buildings for asbestos and <br /> lead-based paint.Demolition,renovation,or <br /> Cb modification of any structures identified as <br /> containing asbestos or lead-based paint shall be <br /> R' performed by a licensed asbestos and lead-based <br /> paint abatement contractor in accordance with <br /> oapplicable regulations. <br /> ' 4.9-4 Public Health and Safety—Locate a School Site in During design phase SJCCDD,in <br /> an Area of Potential Hazards conjunction with the <br /> v y <br /> < The College Park developers shall have a developer and a <br /> N preliminary Endangerment Assessment(PEA) qualified hazardous <br /> rn prepared by a qualified hazardous materials materials expert;in <br /> °0 consultant for the school located near the Lucky J consultation with CDE <br /> �• Dairy, if required by California Department of and DTSC <br /> o v Education(CDE).The PEA shall be prepared in <br /> > > accordance with CDE and Department of Toxic <br /> -< = Substances Control(DTSC)requirements and <br /> I I I I I I I I I I I I I I I I I I I <br />