Laserfiche WebLink
r r V_ r r r r r- r r- r r r r- r r-- U_ r- r- <br /> co0 <br /> N o <br /> m College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> 0 � Implementation&Verification <br /> c Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Action <br /> Completed <br /> = p <br /> employing one of several methods outlined in <br /> = Section 5.2,4:15 of the SJMSCP. These include <br /> Nretention of tall vegetation,regular discing of the <br /> CD site, or use of chemicals or traps to kill ground <br /> a squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review). The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> During the nonbreeding season(September I <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> d <br /> S During the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> 0 not be disturbed and shall be provided with a <br /> 0 250-foot protective buffer until and unless <br /> the Technical Advisory Committee, with the <br /> concurrence of the permitting agencies' <br /> o- representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> g• noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles <br /> mo from the occupied burrows are foraging <br /> m y independently and are capable of <br /> 3 independent survival. After the fledglings <br />