Laserfiche WebLink
r- r r r- r- r- r- r-- V r <br /> m o <br /> dCollege Park at Mountain-House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> c Mitigation Measure Timing/Schedule <br /> o Responsibility Action Date <br /> Completed <br /> ° for Protection of the San Joaquin Kit Fox before <br /> S <br /> 0 or during Ground Disturbance(US Fish and <br /> y Wildlife Service [FWS] 1999b) shall apply <br /> m (except that pre-construction survey protocols <br /> shall remain as established in the above <br /> CD <br /> paragraph).These standards include provisions for <br /> educating construction workers regarding the kit <br /> fox,keeping heavy equipment operating at safe <br /> speeds,checking construction pipes for kit fox <br /> occupation during construction, and similar low- <br /> or no-cost activities. <br /> 4.10-10 Biological Resources—Loss or Alteration of Before construction SJCOG,in <br /> w Jurisdictional Waters of the United States coordination with <br /> Impacts to waters of the United States are not currently DFG,USACE and/or <br /> mitigated by participation in the SJMSCP.Therefore, RWQCB <br /> the College Park developers shall implement the <br /> following measures: <br /> < Before implementation of any Tentative Map or <br /> development project(if no Tentative Map)under <br /> o the College Park project,a formal Section 404 <br /> delineation of waters of the United States, <br /> 0including wetlands,shall be conducted by a <br /> g qualified biologist in the Tentative Map or <br /> development project area if the area includes <br /> w features that are potentially subject to United <br /> a States Army Corp of Engineers(USACE) <br /> jurisdiction(ponds, irrigation canals, and <br /> $ drainages). The delineation shall be submitted to <br /> USACE for verification. <br /> � < If,based on the verified delineation, it is <br /> o m determined that fill of waters of the United States <br /> E3 o <br /> � <br /> would result from the Tentative Map or <br /> development project,authorization for such fill <br />