Laserfiche WebLink
r U- r V r r r - r IF r r r r r- r-- r-, rr�- <br /> rn 0 <br /> m o <br /> d B College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> 5 d Implementation$Verification <br /> o Implementation <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> �• biologist within the 2 weeks before construction <br /> o or tree removal begins. If no active nests are <br /> N found,no further mitigation shall be required. <br /> (D < If active nests are found,impacts shall be <br /> avoided by establishment of appropriate buffers. <br /> 0. No project activity shall commence within the <br /> buffer area until a qualified biologist confirms <br /> mthat the nest is no longer active. DFG guidelines <br /> recommend implementation of 0.25-or 0,5-mile <br /> buffers, but the size of the buffer may be adjusted <br /> if a qualified biologist and DFG determine it <br /> would not be likely to adversely affect the nest. <br /> Monitoring of the nest by a qualified biologist <br /> may be required if the activity has potential to <br /> adversely affect the nest. <br /> Burrowing Owl Before construction SJCOG, in <br /> < Before project activity, focused surveys for consultation with DFG <br /> burrowing owls shall be conducted by a qualified <br /> biologist in areas of suitable habitat on and <br /> o within 250 feet of the project site. Surveys shall <br /> be conducted in accordance with DFG protocols <br /> o (DFG 1995). <br /> o < If no occupied burrows are found in the survey <br /> area, a letter report documenting survey methods <br /> m and findings shall be submitted to DFG,and no <br /> CL further mitigation is necessary. <br /> a < If an occupied burrow with an active nest is <br /> o found, impacts shall be minimized by <br /> establishing a 250-foot buffer area around the <br /> v burrow.No project activity shall occur within the <br /> 3 mo buffer area until a qualified biologist confirms <br /> 3 that the nest is no longer active.The size of the <br /> buffer area may be adjusted if a qualified <br />