Laserfiche WebLink
r— r— r I I I f I- r f f f r . r r_. r— r r r <br /> Cnn <br /> W O <br /> m College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> o °= Implementation Implementation&Verification <br /> c g Mitigation Measure Timing/Schedule <br /> o Responsibility Action Date <br /> Completed <br /> 4.13. NOISE <br /> 0 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD,in <br /> Noise conjunction with the <br /> Cl) < Lunt project construction activities to the hours developer <br /> m between 6:00 a.m. and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> v Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile, with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> w recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> installed around stationary equipment, if <br /> onecessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD,in <br /> Noise and during conjunction with the <br /> �. The project applicants shall incorporate the measures construction developer <br /> d <br /> identified below into the project design. <br /> a Commercial,Office,and Industrial Uses <br /> Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> v exceedance of 55 dBA L.q during daytime hours <br /> M <br /> (7:00 a.m. to 10:00 p.m.)or 50 dBA L.q during <br /> nighttime hours(10:00 p.m, to 7:00 a.m.)at off-site <br /> noise-sensitive receptors. In addition, design and <br />