Laserfiche WebLink
r r i i i I r r r F r— U_ r r— F-- r-- IF I i <br /> W n <br /> � o <br /> d m College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation <br /> Implementation&Verification <br /> G Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> _ <br /> 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> x Mountain House Parkway construction <br /> NThe following measures shall be implemented by the <br /> College Park developers: <br /> C/) < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> D not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers. This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-facing pond berm shall be densely landscaped <br /> K by the College Park developers. In addition, the berm <br /> shall be constructed by the College Park developers <br /> ° using contoured and rounded slopes to avoid angular <br /> face slopes. This shall be done concurrent with <br /> o development of the pond. <br /> _ <br /> o <br /> _ <br /> m <br /> _ <br /> n <br /> 70 <br /> m <br /> 9' <br /> E3 m <br /> o <br />