My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003409
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
5317
>
2600 - Land Use Program
>
PA-0400127
>
SU0003409
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:51 AM
Creation date
9/5/2019 10:48:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003409
PE
2626
FACILITY_NAME
PA-0400127
STREET_NUMBER
5317
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
APN
21318022
ENTERED_DATE
4/1/2004 12:00:00 AM
SITE_LOCATION
5317 W GRANT LINE RD
RECEIVED_DATE
3/31/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\5317\PA-0400127\SU0003409\APPL.PDF \MIGRATIONS\G\GRANT LINE\5317\PA-0400127\SU0003409\CDD OK.PDF \MIGRATIONS\G\GRANT LINE\5317\PA-0400127\SU0003409\EH COND.PDF \MIGRATIONS\G\GRANT LINE\5317\PA-0400127\SU0003409\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-04-127(UP) <br /> 3. Dedication to result in a forty-two(42)foot wide right-of-way from the centerline of Grant Line Road to <br /> the property line shall be required across the frontage of the parcel. <br /> (Development Title Section 9-1150.5) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is $752.00 per 1000 gross square foot of <br /> building designated as Manufacturing in the Tracy area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00433) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 7. Applicant shall obtain a Storm Water Pollution Prevention Plan(SWPPP)permit from the State Water <br /> Resources Control Board prior to the beginning of any construction. <br /> 8. All new structures and/or substantial improvements constructed within the 100-year floodplain shall be <br /> elevated a minimum of one(1)foot above the 100-year flood elevation of twenty-two(22)feet NGVD. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> Driveway shall be located as far away as possible from the intersection of Grant Line Road and <br /> Maple Avenue. <br /> DTP:DG:ar <br /> P\CO�"200APA-0 127.wPd <br />
The URL can be used to link to this page
Your browser does not support the video tag.