My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011967
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GUERNSEY
>
3510
>
2600 - Land Use Program
>
PA-1800222
>
SU0011967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:34 AM
Creation date
9/5/2019 10:52:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011967
PE
2622
FACILITY_NAME
PA-1800222
STREET_NUMBER
3510
Direction
E
STREET_NAME
GUERNSEY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15714032
ENTERED_DATE
9/25/2018 12:00:00 AM
SITE_LOCATION
3510 E GUERNSEY AVE
RECEIVED_DATE
9/28/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GUERNSEY\3510\PA-1800222\SU0011967\APPL.PDF \MIGRATIONS\G\GUERNSEY\3510\PA-1800222\SU0011967\CDD OK.PDF \MIGRATIONS\G\GUERNSEY\3510\PA-1800222\SU0011967\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-1800222 (MS) Project - 2 - 16 October 2018 <br /> San Joaquin County <br /> the United States Environmental Protection Agency (USEPA). Basin Plan amendments <br /> only become effective after they have been approved by the OAL and in some cases, the <br /> USEPA. Every three (3) years, a review of the Basin Plan is completed that assesses the <br /> appropriateness of existing standards and evaluates and prioritizes Basin Planning issues. <br /> For more information on the Water Quality Control Plan for the Sacramento and San <br /> Joaquin River Basins, please visit our website: <br /> http://www.waterboards.ca.gov/centralvalley/water_issues/basin_plans/. <br /> Antidegradation Considerations <br /> All wastewater discharges must comply with the Antidegradation Policy (State Water Board <br /> Resolution 68-16) and the Antidegradation Implementation Policy contained in the Basin <br /> Plan. The Antidegradation Policy is available on page IV-15.01 at: <br /> http://www.waterboards.ca.gov/centraIvaIleywater_issues/basi_n_plans/sacsjr.pdf <br /> In part it states: <br /> Any discharge of waste to high quality waters must apply best practicable treatment or <br /> control not only to prevent a condition of pollution or nuisance from occurring, but also to <br /> maintain the highest water quality possible consistent with the maximum benefit to the <br /> people of the State. <br /> This information must be presented as an analysis of the impacts and potential impacts <br /> of the discharge on water quality, as measured by background concentrations and <br /> applicable water quality objectives. <br /> The antidegradation analysis is a mandatory element in the National Pollutant Discharge <br /> Elimination System and land discharge Waste Discharge Requirements (WDRs) permitting <br /> processes. The environmental review document should evaluate potential impacts to both <br /> surface and groundwater quality. <br /> li. Permitting Requirements <br /> Construction Storm Water General Permit <br /> Dischargers whose project disturb one or more acres of soil or where projects disturb less <br /> than one acre but are part of a larger common plan of development that in total disturbs <br /> one or more acres, are required to obtain coverage under the General Permit for Storm <br /> Water Discharges Associated with Construction Activities (Construction General Permit), <br /> Construction General Permit Order No. 2009-009-D`dVQ. Construction activity subject to <br /> this permit includes clearing, grading, grubbing, disturbances to the ground, such as <br /> stockpiling, or excavation, but does not include regular maintenance activities performed to <br /> restore the original line, grade, or capacity of the facility. The Construction General Permit <br /> requires the development and implementation of a Storm Water Pollution Prevention Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.