Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-99-63 <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $646.00 per <br /> 1,000 gross square foot of building as Manufacturing in the Stockton area. The fee shall <br /> be automatically adjusted July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:RWH:ti <br /> PS-9107111B <br /> E: Manuel Lopez, Deputy Director/Development <br />