My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012279
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2600 - Land Use Program
>
PA-1900025
>
SU0012279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 9:22:19 AM
Creation date
9/5/2019 10:57:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012279
PE
2631
FACILITY_NAME
PA-1900025
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
APN
19327019
ENTERED_DATE
4/17/2019 12:00:00 AM
SITE_LOCATION
10500 S HARLAN RD
RECEIVED_DATE
4/16/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10500\PA-1900025\SU0012279\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINDINGS FOR SITE APPROVAL <br /> PA-1900025 <br /> GRANITE CONSTRUCTION COMPANY/CENTRAL VALLEY CONCRETE <br /> 1. The proposed use is consistent with the goals, policies, standards, and maps of the General Plan, any <br /> applicable Master Plan, Specific Plan, and Special Purpose Plan, and any other applicable plan adopted <br /> by the County. <br /> • This finding can be made because the Construction Services-Heavy Use Type may be <br /> conditionally permitted in the I-G (General Industrial) zone with an approved Site Approval <br /> application. The I-G zone implements the General Plan's I/G (General Industrial) designation. <br /> The subject parcel has a General Plan designation of I/G and is zoned I-G. Therefore, the use <br /> is consistent with the goals, policies, standards, and maps of the General Plan. There are no <br /> Master Plans, Specific Plans, and/or Special Purpose Plans in the project vicinity. <br /> 2. Adequate utilities, roadway improvements, sanitation, water supply, drainage, and other necessary <br /> facilities have been provided, and the proposed improvements are properly related to existing and <br /> proposed roadways. <br /> • This finding cam be made because of the 11.07-acre parcel is of adequate size and shape to <br /> accommodate the proposed concrete batch plant and construction services operation and all <br /> necessary improvements. The Site Plan shows that there is sufficient area for parking and <br /> circulation, in compliance with Standards of the Development Title. <br /> 3. The site is physically suitable for the type of development and or the intensity of development. <br /> • This finding can be made because the parcel is of adequate size and shape to accommodate <br /> the proposed uses and the requirements of the Development Title.The Site Plan shows there <br /> is sufficient area for parking and circulation in compliance with the Standards of the <br /> Development Title <br /> 4. Issuance of the permit will not be significantly detrimental to the public health, safety, or welfare or be <br /> injurious to the property or improvements of adjacent properties. <br /> • This finding can be made because the Initial Study prepared for this project found no <br /> potentially significant environmental impacts. <br /> 5. The use is compatible with adjoining land uses. <br /> • This finding can be made because the proposed uses will not interfere with nor alter the current <br /> land uses on adjacent properties. Surrounding properties are mainly industrial. The nearest <br /> residence is on the adjacent parcel to the east and is approximately 1,230 feet from the project <br /> site. <br /> PA-1900025— Findings 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.