Laserfiche WebLink
I.W.- <br /> STANDARD OBSERVATIONS <br /> Weekly site inspections have been performed during the first quarter of 2000 and in prior quarters. <br /> A summary of the weekly observations for the quarter can be found on the form in Appendix G. A <br /> signature on the form is the certification that all observations were performed and are accurate. <br /> RUN-OFF/RUN-ON FACILITIES <br /> The Harney Lane Sanitary Landfill utilizes a single facility to control run-off and run-on. A <br /> perimeter berm which contains the perimeter road for the site prevents any water from entering the <br /> site. On the inside of this road is a ditch that contains all surface runoff from the unit and directs all <br /> water to a storm water retention pond located at the South end of the site. During the first quarter <br /> of 2000 there were no breeches in the run-off/run-on facilities,and this will continue to be monitored <br /> in the future. <br /> 7 <br />