Laserfiche WebLink
29. Transit Vehicles: Concurrent with the issuance of each first building permit the applicant shall <br /> deposit in a CSD maintained Vehicle Capital Fund an amount equal to their prorata share <br /> (based on the CFF Plan Fee formula as determined by the MHCSD) of the total cost of <br /> Transit Vehicles as that cost is specified in the latest update of the CFF Plan Fees. <br /> 30. Administration Facilities: Concurrent with the issuance of each building permit the Applicant <br /> shall deposit in a MHCSD maintained Administration Facilities Capital Fund an amount equal <br /> to their pro-rata share (based on the CFF Plan Fee formula as determined by the MHCSD)of <br /> the total cost of the Administration Facilities as that cost is specified in the latest update of the <br /> CFF Plan Fees. Alternatively, the applicant may construct the Administration Facilities. <br /> Construction shall begin prior to the 10,000`" building permit within the Mountain House <br /> Master Plan Area, or as determined by the MHCSD General Manager. Construction shall be <br /> completed within 18 months of the commencement of construction, unless waived by the <br /> MHCSD General Manger. <br /> 31. Police Substation: Concurrent with the issuance of each building permit the Applicant shall <br /> deposit in a MHCSD maintained Police Substation Capital Fund an amount equal to their pro- <br /> rata share(based on the CFF Plan Fee formula as determined by the MHCSD)of the total <br /> cost of the Police Substation as that cost is specified in the latest update of the CFF Plan <br /> Fees. Alternatively, the applicant may construct the Police Substation. <br /> 32. Temporary Turnarounds: All streets, which are to be stubbed for future extension, will require <br /> temporary turnarounds, unless waived by the MHCSD and shall be shown on the <br /> Improvement Plans. <br /> 33. Recyclable Construction Waste: Recycling of construction wastes, such as wood and metal, <br /> shall be made part of the improvement plans and construction specifications for contractors in <br /> compliance with MHCSD requirements. Condition shall be met before approval of <br /> improvement plans or the commencement of construction, whichever comes first. <br /> 34. Traffic and Transportation: The applicant shall improve all streets shown on the Tentative <br /> Map. The MHCSD may allow phased improvements subject to the Subdivision Agreement <br /> and bonding. <br /> 35. The General Manager shall approve alternative funding of the various improvements, subject <br /> to existing agreements and ordinances. <br /> 36. The following statement applies to all the conditions listed here: If the MHCSD Public Works <br /> Director determines that a facility or a street improvement is not yet warranted, the Public <br /> Works Director may allow the facility or the street improvement to be delayed. The developer <br /> shall provide adequate bonding to the MHCSD assuring construction at the time the MHCSD <br /> Public Works Director determines the facility or street is needed. <br /> 37. The applicant fund and perform a traffic study and a transportation monitoring program and <br /> shall comply with the Transportation Monitoring Program.The applicant shall comply with the <br /> requirements of the Transportation Demand Management and Transit Plan (Hoyt, 1997) as <br /> administered by the MHCSD. <br /> 38. The applicant shall submit for MHCSD approval a Construction Truck Management Plan for <br /> construction activities, prior to any construction. <br /> 39. The applicant shall perform a traffic signal warrant study and comply with the results of the <br /> study, installing traffic signals where they are warranted. The applicant shall also install or <br /> bond for the signals that are within the tentative map area but are not warranted at the time of <br /> filing a final map. <br /> Conditions of Approval -13- <br />