Laserfiche WebLink
E. Electrical transformers within residential Neighborhoods shall be in underground <br /> vaults, subject to MHCSD and Modesto Irrigation District(MID) requirements. The <br /> developer shall pay for any incremental costs relating to undergrounding <br /> transformers not paid for by MID. <br /> F. Transformers located in the downtown area, commercial and industrial areas may be <br /> placed above ground provided they are aesthetically designed and/or shielded by <br /> landscaping subject to MHCSD and MID requirements. <br /> G. The developer shall fund, design and construct the required storm drainage system in <br /> accordance with the requirements of the Storm Water Master Plan Update and the <br /> MHCSD's Standards and Specifications to serve the Tracts, unless otherwise <br /> required or approved by the MHCSD General Manager. <br /> H. The applicant shall purchase, install and maintaib catch basin filters and/or other <br /> source control Best Management Practices(BMPs) for urban runoff from Tracts as <br /> determined by the MHCSD. MHCSD approved catch basin insert filters must be <br /> installed, in tract and on the arterial streets abutting the project prior to home <br /> construction. They shall be properly maintained and filters replaced if damaged or <br /> filled with debris. <br /> L All filters on private roadways shall be approved by the MHCSD and shall be privately <br /> maintained. <br /> J. All non-residential (i.e. Office, Industrial, Commercial, Neighborhood Commercial <br /> etc), uses must enter into a Discharge Agreement with MHCSD. <br /> 62. WASTEWATER TREATMENT PLANT <br /> A. The applicant shall provide to the MHCSD evidence of capacity to serve the project in <br /> the wastewater treatment plant or the applicant shall fund, design and construct the <br /> last phased expansion of the wastewater treatment plant(WWTP) and/or systems <br /> necessary to meet these requirements, prior to the approval of the first development <br /> Final Map. <br /> B. The developer shall extend existing pipelines to the project site as shown on the <br /> Master Sanitary Sewer Plan. <br /> 63. WATER TREATMENT PLANT <br /> The applicant shall provide to MHCSD evidence of adequate water capacity to serve the <br /> project in the water treatment plant or the applicant shall fund, design and construct the last <br /> phased expansion of the water treatment plant(WTP) and/or systems necessary to meet <br /> these requirements prior to the approval of the first development Final Map. <br /> Construction Emissions: The applicant shall implement the Regulation VIII Control Measures <br /> of the SJVAPCD and applicable measures in Table 6-3 of the SJVAPCD Guide for Assessing <br /> and Mitigating Air Quality Impacts. <br /> 64. Construction-Related Erosion: The applicant and/or contractor shall comply with applicable <br /> NPDES General Construction Activities Storm Water Permit requirements established by the <br /> Clean Water Act. Pursuant to the NPDES Storm Water Program, a WDID number shall be <br /> noted on the Grading Plans. <br /> Conditions of Approval -39- <br />