Laserfiche WebLink
CONDOR EARTH TECHNOLOGIES INC <br /> 21663 Brian Lane• P.O. Box 3905 <br /> Sonora CA 95370 <br /> Phone 209.532.0361 <br /> R FAX 209.532.0773 <br /> CONDO R www.condorearth.com <br /> Condor Project No. 4601X <br /> July 23, 2009 JUL 2 72009 <br /> Brendan Kenny <br /> ENVIRONNIEN f I1EAITH California Regional Water Quality Control Board PERMITISERVICES <br /> Central Valley Region <br /> 11020 Sun Center Drive,No. 200 <br /> Rancho Cordova,CA 95670-6114 <br /> Subject: Second Revised Site Characterization Work Plan for Effluent Reservoirs 1A, 1B, and 2 <br /> Mountain House Wastewater Reclamation Facility <br /> Mountain House,San Joaquin County,California <br /> Dear Mr. Kenny: <br /> This letter is the Second Revised Site Characterization Work Plan(Work Plan) that describes activities to <br /> be undertaken at the Mountain House Treatment Plant Reclamation Areas and Reservoirs IA, 1B, and 2. <br /> Changes to the previous submittal dated March 23, 2009 include correcting a reference from I to 1B in <br /> section 4.2.1 and specifying 8-oz. jars be used so there will be no question that adequate sample for <br /> _ subsequent discrete sample testing will be available if needed. The objective of this work is to adequately <br /> characterize the soil underlying the discharge areas to determine if groundwater under the reservoirs is at <br /> greater risk of degradation than nearby background areas. This work was prepared at the request of SMH <br /> Mountain House, LLC (SMH). SMH seeks to decommission the land discharge facilities and to regrade <br /> the site to the original topographic surface. SMH seeks guidance from the California Regional Water <br /> Quality Control Board(Regional Water Board)with the decommissioning process. <br /> 1.0 SUBMITTAL HISTORY <br /> The following submittals and contacts, listed in reverse chronological order, have occurred related to <br /> Regional Water Board guidance for decommissioning the facilities. These will be referenced by number <br /> in later sections of this Work Plan. <br /> 1. On or about December 16, 2008, Tim O'Brien of the Regional Water Board and John Kramer of <br /> Condor Earth Technologies, Inc. (Condor) discussed the letter Response to Comments dated <br /> October 22, 2008. Mr. O'Brien requested that the letter with response to comments and the <br /> original Work Plan be consolidated into one document. <br /> " 2. On October 22, 2008, SMH submitted a letter "Response to Comments" prepared by Condor, <br /> including data on earthen materials in the ponds to demonstrate that no soil is present. <br /> 3. On July 21, 2008, the Regional Water Board provided a "Workplan Review, Site Closure <br /> Characterization Work Plan..." <br /> 4. On June 26, 2008, monitoring of Reclamation Area 1 required by Order No. 98-109 was <br /> informally waived in an email from Tim O'Brien because the facilities are no longer used for land <br /> discharge. <br />