Laserfiche WebLink
U.S.Department of Homeland Securih' <br /> FEMA Region IX <br /> I I I I Broadway,Suite 1200 <br /> Oakland,CA.94607-4052 <br /> F4Aaiy <br /> o�1c r <br /> s�° FEMA <br /> May 29,2018 <br /> Alisa Goulart,Project Manager <br /> San Joaquin County, Community Development Department <br /> Development Services Division <br /> 1810 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Dear Ms. Goulart: <br /> This is in response to your request for comments regarding Application Referral Application <br /> Number PA 1800114 (MS),Minor Subdivision application(APN/Address: 229-260-27, <br /> -30/18200 South Henry Road,Escalon) (Supervisorial District 4). <br /> Please review the current effective countywide Flood Insurance Rate Maps(FIRMS) for the <br /> County of San Joaquin(Community Number 065043), Maps revised October 20, 2016 and City <br /> of Escalon(Community Number 060644), Maps revised October 16, 2009. Please note that the <br /> City of Escalon, San Joaquin County, California is a participant in the National Flood Insurance <br /> Program (NFIP). The minimum, basic NFIP floodplain management building requirements are <br /> described in Vol. 44 Code of Federal Regulations(44 CFR), Sections 59 through 65. <br /> A summary of these NFIP floodplain management building requirements are as follows: <br /> • All buildings constructed within a riverine floodplain, (i.e., Flood Zones A, AO, AH, AE, <br /> and Al through A30 as delineated on the FIRM),must be elevated so that the lowest <br /> floor is at or above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rate Map. <br /> • If the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM, any development must not increase base flood elevation levels. The term <br /> development means any man-made change to improved or unimproved real estate, <br /> including but not limited to buildings, other structures, mining, dredging, filling, <br /> grading, paving, excavation or drilling operations, and storage of equipment or <br /> materials. A hydrologic and hydraulic analysis must be performed prior to the start of <br /> development, and must demonstrate that the development would not cause any rise in <br /> base flood levels. No rise is permitted within regulatory floodways. <br /> www.femagov <br />