My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004576
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HENRY
>
22469
>
2600 - Land Use Program
>
PA-0400250
>
SU0004576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:30:19 AM
Creation date
9/5/2019 11:15:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004576
PE
2605
FACILITY_NAME
PA-0400250
STREET_NUMBER
22469
Direction
S
STREET_NAME
HENRY
STREET_TYPE
RD
City
ESCALON
APN
24905017
ENTERED_DATE
7/26/2004 12:00:00 AM
SITE_LOCATION
22469 S HENRY RD
RECEIVED_DATE
7/20/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\H\HENRY\22469\PA-0400250\SU0004576\APPL.PDF \MIGRATIONS\H\HENRY\22469\PA-0400250\SU0004576\CDD OK.PDF \MIGRATIONS\H\HENRY\22469\PA-0400250\SU0004576\EH COND.PDF \MIGRATIONS\H\HENRY\22469\PA-0400250\SU0004576\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Michael Callahan, 468-3000) <br /> a. The excavation plan shall be prepared by a Registered Civil Engineer or Land Surveyor and include <br /> the following: <br /> (1) Detail of access road (first 100 feet from Santa Fe Road shall be paved). <br /> (2) A plan of the haul route for County roads. <br /> (3) Stockpile area for top soil (no excavation or stockpile shall be allowed within 25 feet of the <br /> property boundary or the County planned right-of-way). <br /> (4) Public roads shall be kept free from mud, dirt, and gravel resulting from quarry operations. <br /> b. All private roads involved in an excavation shall be maintained so as to control dust. <br /> c. A video tape of the planned haul route showing conditions of all County roads shall be prepared. <br /> The condition of San Joaquin County maintained roads along the haul route shall be reviewed with <br /> Public Works prior to the start of excavation. Any proposed changes to the haul route shall require a <br /> revision to the conditions of approval. (Development Title Section 9-1415.2) <br /> d. Loads on at public roads shall be restriced to legal loads only. (Street and Highway Title Section 10- <br /> 2350) <br /> e. An encroachment permit shall be required for work within the road right-of-way. (Development Title <br /> Sections 9-1145.4 and 9-1145.5) <br /> f. The applicant shall construct a 150-foot left-turn pocket for southbound Santa Fe Road at the project <br /> access point. <br /> g. All improvements shall be in conformance with the current Improvement Standards and <br /> Specifications of San Joaquin County. All improvement plans and specifications are subject to plan <br /> check and field inspection fees and must be approved by Public Works prior to the issuance of an <br /> encroachment permit. (Development Title Section 9-1150.2) <br /> h Dedication to result in a 25-foot-wide right-of-way from the centerline of Hall Road to the property line <br /> shall be required across the frontage for APN 247-230-09. (Development Title Section 9-1150.5) <br /> i A Maintenance Agreement to ensure that all roads designated as haul routes are maintained to a <br /> condition acceptable to San Joaquin County shall be executed by the applicant. In lieu of the <br /> maintenance agreement, a one-time road maintenance fee or an annualized maintenance fee may <br /> be acceptable to the County. Application for either of the in-lieu fees may be made to Public Works. <br /> j. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is$179.44 per trip-end in the Escalon <br /> area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. The number of trip-ends may be <br /> determined by a proportion to the length in time of the excavation operation. (Resolution R-96-592) <br /> k. Prior to the start of operations, the applicant must obtain coverage under the State National Pollutant <br /> Discharge Elimination System (NPDES) General Plan for Discharge of Stormwater associated with <br /> industrial activities by fling a Notice of Intent(NOI) to comply with the State Water Resources Control <br /> Board and developing a Storm Water Pollution Prevention Plan (SWPPP) (Industrial). <br /> Conditions of Approval - 5 - PA-0400250 <br />
The URL can be used to link to this page
Your browser does not support the video tag.