Laserfiche WebLink
2�U>o9z, <br /> CERTIFICATE OF OCC FANCY ROUTING FORM <br /> 4r =` San Joaquin CountyCommunity Development Departf,ent <br /> J 1810 E.Hazelton Ave,Stockton,Ca 95205 <br /> its / Business Phone(209)468-3121 <br /> Permit No: BP-2004154 APN: 212-160-19 Contractor: HAGGERTY CONSTRUCTION <br /> Job-Site Address: Use of Structure:Office and Warehouse <br /> Planning Application No: <br /> OWNER NAME AND ADDRESS <br /> Name: HOLLY COMMERCE CENTER LLC <br /> Address: PO BOX 930 STOCKTON CA 95201- <br /> Telephone: <br /> STRUCTURE REQUIREMENTS <br /> Occupancy Group: S-1 B Occupancy Load: 104 <br /> Type of Construction:VB Square Feet:41425 j <br /> Zoning-.I-G Fire Sprinklers:Provided:NO j <br /> Before a final inspection can be made by the Building Inspection Division,and prior to issuance of a Certificate of <br /> Occupancy by the Building Official,APPROVAL SIGNATURES must be obtained from the agencies indicated below. It <br /> is the applicant's responsibility to obtain all signatures and return this form to the Community Development Department. <br /> Please be aware that advanced notice and a field inspection time may be required by each agency prior to signature. <br /> NOTE:PLEASE BRING YOUR APPROVED BUILDING PLANS WHEN OBTAINING SIGNATURES ON THE <br /> CERTIFICATE OF OCCUPANCY ROUTING FORM. <br /> APPROVAL RE UI D: DATE: <br /> N zA; <br /> DEP RTMENT - PUBLIC WORKS 20 - 6 -3000 2 <br /> a 1 <br /> ENVIRQ MENT L SALT 204-468-3420 <br /> l <br /> COUNTY FIRE WARDEN 209468-3166 <br /> L"_J <br /> FIRE CHIEF-FIRE DISTRICT:TRACY RURAL 209-831-6700 <br /> a � <br /> CALTRANS 209-948-7543 <br /> MOUNTAIN HOUSE CSD 209-468-0327 <br /> F <br /> STOCKTON METRO AIRPORT 209-468-4700 <br /> OTHER: i <br /> i <br /> NOTE TO DEPARTMENTS LISTED ABOVE: Your signature indicates that your conditions have been met and <br /> authorize the Community Development Department to complete a final inspection. I <br /> i <br /> Once the required signatures above are obtained,return this form to the Community Development Department. A final <br /> building inspection will be scheduled at your request. A final inspection will not be scheduled until this form has becn j <br /> comnleted and returned. ' <br /> c. <br />