Laserfiche WebLink
Map ID MAP FINDINGS <br /> Direction <br /> - Distance <br /> Distance(ft.) EDR ID Number <br /> Elevation Site Database(s) EPA ID Number <br /> MARLEY COOLING TOWER CO. (Continued) 1000283351 <br /> Event: Igration of Contaminated Groundwater under Control,Yes,Migration of <br /> Contaminated Groundwater Under Control has been verified.Based on a review <br /> -- of information contained in the EI determination,it has been determined <br /> that migration of contaminated groundwater is under control at the facility. <br /> Specifically,this determination indicates that the migration of <br /> contaminated groundwater is under control,and that monitoring will be <br /> conducted to confirm that contaminated groundwater remains within the <br /> existing area of contaminated groundwater.This determination will be <br /> re-evaluated when the Agency becomes aware of significant changes at the <br /> facility. <br /> Event Date: 08/11/2000 <br /> Event: Current Human Exposures under Control,Yes,Current Human Exposures Under <br /> Control has been verified.Based on a review of information contained in the <br /> EI determination,current human exposures are expected to be under control <br /> at the facility under current and reasonably expected conditions.This <br /> determination will be re-evaluated when the Agency/State becomes aware of <br /> significant changes at the facility. <br /> Event Date: 04/08/1998 <br /> - Event: Igration of Contaminated Groundwater under Control,Yes,Migration of <br /> Contaminated Groundwater Under Control has been verified.Based on a review <br /> of information contained in the EI determination,it has been determined <br /> that migration of contaminated groundwater is under control at the facility. <br /> Specifically,this determination indicates that the migration of <br /> contaminated groundwater is under control,and that monitoring will be <br /> conducted to confirm that contaminated groundwater remains within the <br /> existing area of contaminated groundwater.This determination will be <br /> re-evaluated when the Agency becomes aware of significant changes at the <br /> facility. <br /> Event Date: 04/08/1998 <br /> Event: CMI Workplan Approved <br /> Event Date: 08/22/1997 <br /> Event: Corrective Measures Design Approved <br /> Event Date: 08/06/1997 <br /> Event: Stabilization Measures Evaluation,This facility is not amenable to <br /> stabilization activity at the present time for reasons other than 1)it <br /> appears to be technically infeasible or inappropriate(NF)or 2)there is a <br /> lack of technical information(IN).Reasons for this conclusion may be the <br /> status of closure at the facility,the degree of risk,timing <br /> considerations,the status of comective action work at the facility,or <br /> other administrative considerations. <br /> Event Date: 08/27/1992 <br /> Event: CA Prioritization,Facility or area was assigned a high corrective action <br /> priority. <br /> Event Date: 07/24/1992 <br /> Event: RFI Approved <br /> Event Date: 06/29/1990 <br /> TC01479331.1 r Page 26 <br />